BVHS Mechanical & Electrical Upgrades.


The summer has brought construction of a project at the local high school. It started as a boiler replacement that removed an old steel tube boiler and replaced it with two condensing gas boilers. To make maximum use of the boilers condensing features, the school also replaced the existing blower coils with new semi custom air handlers. The School originally did not have the funds to start the project so it was put on hold for about year and during that time we were tasked with writing a grant application to The Governors Office of Energy Efficiency which resulted in a $130k award for the project. Now it is a year latter and the contractors are finishing the controls in time for school.

Mmmmm pretty stainless steel!















New fan room on the second floor to house the new Temptrol air handlers and new supply air duct constructed of fabric (notice the new fabric duct in the gymnasium also!)

2 comments:

Unknown said...

Hi, nice post. Well what can I say is that these is an interesting and very informative topic. Thanks for sharing your ideas, its not just entertaining but also gives your reader knowledge. Good blogs style too, Cheers!

mechanical design jobs

Unknown said...

I high appreciate this post. It’s hard to find the good from the bad sometimes, but I think you’ve nailed it! would you mind updating your blog with more information?Calgary Boilers